Skip to content
Thermal intelligence for Malaysian data centres

Find the hot spots.Fix them. Keep them fixed.

Embun Intelligence measures and simulates the airflow in your data hall or server room, gives you a ranked list of fixes with ringgit savings, then watches every rack 24/7 so the fixes stay in place.

Independent advice. We don’t sell cooling equipment.

Embun Monitor

Example

20.5°C avg

Floor-plan heat map

Example dashboard, using readings from the airflow study below.

  • Independent: no equipment to sell
  • Data stays in Malaysia
  • Support in English, Bahasa Melayu and 中文
  • Watched 24/7
Evidence first

One roof over the cold aisle. 28 °C cooler at the top servers.

Without containment, hot exhaust spills over the racks and the top servers breathe air far above safe limits. Every Embun audit shows you this kind of before-and-after for your own room, using measured data and 3D models.

Get the sample CFD report

See what an Embun audit gives you: hot spots, root causes, ranked fixes and a before-and-after simulation. We’ll email it to you.

Average rack inlet
28.6 to 20.5 °C
Worst rack inlet
54 to 26 °C
No containmentCold-aisle containment
With cold-aisle containment: a roof over the cold aisle blocks the spill-over. Rack inlet air averages 20.5 °C, worst 26 °C.Without containment: hot exhaust spills over the racks into the cold aisle. Rack inlet air averages 28.6 °C, worst 54 °C at the top servers.
Air temperature1845 °COpen the full figure

Illustrative 2D model of two 10 kW racks. Customer audits use measured data and 3D simulation.

Malaysian rooms are being asked to do more, with less room for error

Cooling is the biggest energy cost after the IT load itself, and poor airflow is a leading cause of hot spots and failures.

  1. Tropical climate

    01

    High heat and humidity all year leave little margin in cooling design.

  2. Denser AI racks

    02

    GPU servers draw far more power than halls built before 2015 were designed for.

  3. Energy pressure

    03

    Rising power bills and customers asking you to report a better PUE.

How it works

Audit. Fix. Monitor.

Building a new hall? We also run CFD studies and IST thermal surveys for contractors and commissioning agents.

  1. 1

    Step 1 · 1 to 2 weeks

    Thermal & CFD audit

    20 to 30 wireless sensors, thermal camera images and an airflow model of your room checked against real readings. You get ranked fixes with cost and energy savings.

    Ask for a quote
  2. 2

    Step 2 · with licensed partners

    Fix delivery

    Containment, blanking panels and cooling repairs by a CIDB-registered partner. We manage the job and re-measure the room to prove the result.

    Talk to an engineer
  3. 3

    Step 3 · 24/7

    Embun Monitor

    A live floor-plan heat map, SMS and email alerts with escalation, and a monthly report. Set up in a day.

    Ask about Embun Monitor

Who we help

  • Colocation operators

    Prove an older hall can safely take denser racks before you say yes to a customer.

  • Contractors & commissioning

    Extra CFD and thermal-survey capacity for tight handover schedules.

  • Telco & edge sites

    Remote alerts for many small, unmanned rooms across the country.

  • Enterprise server rooms

    Banks, hospitals, universities and factories with no cooling specialist on staff.

Embun means morning dew

Cool, calm and local

We’re a Klang Valley engineering team working across Klang Valley, Johor and Penang. Because we don’t sell cooling equipment, our advice isn’t tied to any vendor.

Number of racks (optional)

An engineer replies within one working day.